Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Sep 15, 2022     45-13 Cabin doors and transparencies Planearound Door Latch - (6 hours)       Category: Fuselage
Preliminary assembly of the Planearound door latch system, which includes a mechanism integrated in the original mechanism.
I created the necessary holes where indicated in the instruction. On each door i drilled the hole to accomodate the middle latch mechanism and the other holes to allow proper operations.
The final adjustment of the openings has been done when inserting the door pins and the rack. I think there are a couple of places where the Planearound instruction are not correct. In one case the hole to facilitate the insertion of a pin on lower door handle rack is misplaced.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.